| Tool Type | Decision Tree |
| Format |
How to Use
Begin the peer review process for existing buildings before the schematic design phase. The peer reviewer works closely with the design engineer to confirm what design approach to use and the scope of retrofit work. A typical Department of Project Management (DPM) renovation project takes several design phases, each subject to some level of peer review.
This flow chart summarizes the process for seismic retrofit in existing buildings.