Stanford University

Seismic Retrofit Flow Chart

Download decision tree Print
Last updated: September 27, 2017
Tool TypeDecision Tree
FormatPDF

How to Use

Begin the peer review process for existing buildings before the schematic design phase. The peer reviewer works closely with the design engineer to confirm what design approach to use and the scope of retrofit work. A typical Department of Project Management (DPM) renovation project takes several design phases, each subject to some level of peer review.

This flow chart summarizes the process for seismic retrofit in existing buildings.

Back to Top

Download full instructions here ->