Stanford University

Performance Verification of Engineering Controls and Safety Equipment

How to use this tool

Engineering controls and equipment must function properly at all times in order to protect the health and safety of laboratory employees. This equipment must be tested according to the below schedule.

* Note: It is the responsibility of users to check inspection tags to make sure inspections are current before using.

 
Equipment Testing Frequency (minimum) Responsible Party Standard
*Eyewash Monthly Plumbing Shop ANSI Z358.1 – 1990
*Safety shower Monthly Plumbing Shop ANSI Z358.1 – 1990
*Fume hoods
*Glove boxes
*Gas Cabinets
Annually HVAC Shop
Laboratory
HVAC Shop
  • 8CCR 5154.1
  • ANSI/AIHAZ9.5 – 1992
  • ANSI/ASHRAE 110 – 1985
  • 8 CCR 5143(a)(5)
HVAC system Annually HVAC Shop Per design specifications
Fire extinguishers
  • Visual Inspection monthly
  • Service annually
Fire Inspection Shop 19CCR 574.1
Back to Top

Download full instructions here ->